Stanford Hospital

Stanford University

Location: Palo Alto, CA

SASCO is assisting Clark/McCarthy as the electrical contractor to provide Design/Assist, 3D coordination with collaborative decision making and use of BIM technology for the new interdisciplinary OSHPD hospital on the Stanford Campus.

The modular design will meet the flexibility needs while providing a framework for future expansion. The new hospital will replace the existing hospital built in 1959, and will feature open air courtyards, a central atrium, and rooftop gardens.

The new hospital will add 368 all-private patient rooms, 28 flexible Surgical and Interventional operating rooms, a 40,000 square foot Imaging Department, a 39,000 square foot Emergency Department, as well as conference, cafeteria and support spaces totaling 820,000 square feet of new construction.

Completion is scheduled for 2017.

Scope of Work

  • Design/Assist
  • Electrical
  • Structured cabling
  • CATV
  • Security
  • Fire Alarm
  • Nurse Call
  • BIM

Features

  • OSHPD
  • 368 all private patient rooms
  • 214 semi-private rooms
  • Operating rooms
  • Emergency department
  • Conference
  • Cafeteria
  • Support spaces